Fabric Membrane Structure Carport Installation Process and Cost
November 08,2019
1. The installation of the tension membrane structure carport includes three parts: the film body unfolding, the connection fixing and the tension forming.
2. When installing the membrane structure carport, a safety net should be installed on the membrane surface, and the operator must wear a safety belt. During the installation process, the operator should wear soft-soled shoes when walking on the membrane surface, and should not wear hard objects such as keys.
3.The installation of the membrane structure carport should be carried out under the condition that the wind power is not more than four. Pay attention to wind speed and wind direction during installation to avoid chattering. At the same time, the suspension and continuation of the project should be determined according to the degree of rainfall.
4. There should be no accumulation of rainwater during the installation of the membrane structure carport. At the same time, the suspension and continuation of the project should be determined according to the degree of rainfall.
5. When pulling, the order and amount of tension should be determined, the speed of tension should be controlled, and the value of the tension should be determined according to the characteristics of the material.
7. The finished product must be protected during the auxiliary process of the membrane body and should not damage the membrane surface. An isolation layer must be provided between the membrane support structures and must not be in direct contact.
8. Before the film surface is unfolded, the clamped plate should be installed first. The spacing between the plates should not exceed 2m. According to the span of the membrane structure, adjust the spacing of the center of the plate. The bolts and nuts of the plate must be tightened into place.
9. The installation of the ridge and valley cable of the membrane structure car shed shall be carried out according to the construction organization design requirements. Temporary ridges and valley pressure ropes should be used before the installation of the notochord and the valleys during the installation of the membrane structure. In the unfinished membrane structure, excessive sloshing occurs under wind load.
10. The assembly of the notochord and the cable head of the membrane structure carport must be strictly carried out according to the technical standards, and the notochord and the valley cable should be pulled into place. The construction work record shall be made for the tension value with control requirements, and the tension travel record shall be recorded for those without control requirements.
BDiR Inc. specializes in the development, design, fabrication, installation and maintenance of membrane structural engineering. Warmly welcome you to visit, guide and negotiate business!
Hot Search:
Previous: Various Eco Safari & Beach Resort - New Zealand
Next: What is Ecotourism?
Archives
News at BDiR
Tensile Membrane Canopies for Corridors and Walkways – Breathing Arteries of Campus Life
September 02,2025
Our Company Successfully Completes the Sunshade Canopy Project for Guangzhou Wenyuan Senior High School
August 06,2025
Crafted with Ingenuity: BDIR Space Structures Creates a New Landmark of Spatial Art for the “San Yue San” Festival in Nanning, Guangxi
May 28,2025
Watch Our Videos
Hotel Tent Reception Hall
PC Starry Sky Resort